|
APARTHOTEL SUNSET G1, BANSKO, BULGARIA
Apartment hotel Sunset G1 is a luxury development in the beautiful mountain resort of Bansko. It has six floors with 30 luxury studios and apartments, all of them featuring a cozy living room and an open plan kitchenette. All the apartments have well fitted en – suite bathrooms, plugs for cable TV, telephone and internet connection. Most of the apartments have beautiful mountain views of either Pirin Mountain or Rila Mountain. In a close proximity to the complex are a Bulgarian tavern, called “Banski han” and a swimming pool.
FACILITIES
- SPA center
- Sauna
- Ski wardrobe
- Reception
PAYMENT PLAN FOR SUNSET G1 - deposit: 2000 Euro
- first installment: 30% (within 30 days on signing of the preliminary contract)
- second installment: 30% (3 months later)
- third installment: 30% (3 months later )
- fourth installment: 10% (on signing of the notary deed
)
PRICE LIST OF SUNSET G1
BUILDING
FLOORPLANS
Ground floor: SPA, Apartments - 4
1st Floor: Apartments – 4
2nd Floor: Apartments – 6
3rd Floor: Apartments – 6
4th Floor: Apartments – 6
5th Floor: Apartments – 4
STANDARD FINISHING OF THE APARTMENTS:
Entrance Hall: flooring - terra-cotta ceilings - plaster coating and latex walls - plaster coating and latex
Bathroom: flooring -terra-cotta walls - faience and plaster ceiling - plaster sanitary unit - toilet, sink, mixing tap, mirror, boiler Living room/Bedroom/Kitchen floor - laminated parquet ceilings - plaster coating and latex walls - plaster coating and latex
Others: Joinery - PVC Inside doors - MDF material-type of covering Water-piping and sewage, water-meters All common parts of the building - fulyl finished, walls-painted, floor-granite Facade - finished according to the architectural plan Parking space available
MAINTENANCE
Annual maintenance fee of 10 EURO per sq.m. which includes:
- Sanitary hygienic maintenance - two times a week
- 24 hours security
- Mini bus to the lift station and back
- Organizing and managing the payment of all running costs for use of the public areas and systems (electricity and water supply)
DATE OF COMPLETION:
July 31, 2007
|